Let a backhoe or excavator do the work with the 210-3 EQ MT. It can drill three holes at once, and you can use the unit’s side-shift control for drilling a second set of holes without having to reposition. A “floating” bucket curl pin helps level the drill, which saves you time because there’s no need to manually level and position the drill.

Air Tank – Reduce air requirements with the 120-gallon air tank that can be used with a 260 cfm air compressor to operate all three drills.

E-Z Drill 210-3 EQMT euipment mounted concrete dowel pin drill with air tank

Horizontal Drilling

Full-Depth Repair

e-z-drill-210-3-eqmt-full-depth-repair

OPTIONS

Air Tank – Reduce air requirements with the 120-gallon air tank that can be used with a 260 cfm air compressor to operate all three drills.

E-Z Drill 210-3 EQMT euipment mounted concrete dowel pin drill with air tank

CONFIGURATIONS

Horizontal Drilling

APPLICATIONS

Full-Depth Repair

e-z-drill-210-3-eqmt-full-depth-repair

Download Printable Spec Sheet

E-Z Drill concrete dowel pin drill mounted to excavator for full depth repair
E-Z Drill 210-3 EQMT concrete dowel pin drill euipment mounted specifications

Horizontal Position

bar

Lower Length (A)47 in (119.4 cm)
Overall Length (A) + (B)91 in (231.1 cm)
Frame Length (B)44 in (111.8 cm)
Width47 in (119.4 cm)
Height35 in (88.9 cm)
Weight1500 lbs (681 kg)
Drill Distance From Corner6 in (15.2 cm)
Drill Distance From Ground3 in (7.6 cm)
Drill Depth (std.)18 in (45.7 cm)
Drill Bit Diameter5/8 in to 2 1/2 in (15.9 mm to 63.5 mm)
Drill Motor (pneumatic)CP 32A
Drill Motor Weight54 lbs (24.5 kg)
Chuck Size (std.)7/8 in x 3 1/4 in (22.2 mm x 82.6 mm)
Air Consumption (minimum)300 cfm (8.4 m 3 /min)
Operating Pressure90 psi (6.2 bar)
Impact (ft. lbs./blow)36 fpb (49 J)
Hammer Speed2200 bpm
Speed288 rpm